News

A A A

SIGNED CONTRACT FOR CONSTRUCTION OF PHASE I OF THE NDF

08.07.2016

A contract for Phase I of the National Disposal Facility for Low- and Intermediate Level Radioactive Waste (NDF) was signed on 7 July 2016 between the Executive Director of SERAW – Mr. Dilyan Petrov and the authorised representatives of a ...

Regarding the retirement process in SERAW

23.02.2016

Not long ago, a statement of Dimitar Manolov – President of Confederation of Labour Podkrepa, was distributed in the public domain in relation to the process of retirement of workers and employees of State Enterprise Radioactive Waste. The document includes ...

Historic drillings sealed at Radiana site

10.09.2015

20 old drillings were sealed at Radiana site in June and July 2015. The total length of the drillings was 850 m. This group of wells was drilled in the period 2008-2011. They were used for survey and characterization of ...

Top